NEUTRINO FACTORY &
MUON STORAGE RINGS AT
CERN
Workshop on a
M
U
O
N
IONIZATION COOLING EXPERIMENT
25-27 October 2001, in CERN PS auditorium,
Bldg. 6-2-006
*
*
*
*
Still Preliminary Agenda
Thursday 25 october
09:00 Welcome (Carlo Wyss)
09:15 Motivation 0: A bit of physics: neutrino factory vs alternatives (JJ. Gomez-Cadenas)
09:40 Motivation I: what does neutrino factory gain with cooling (Alessandra Lombardi)
10:00 Motivation II: why does neutrino factory need a cooling experiment
(Dan Kaplan)
10:30
coffee break
11:00 report from working groups :
Group a : Simulations
Results of simulations of emittance measurement, requirements on beam purity
(Patrick Janot)
lunch break
14:00
Group a : Simulations(ctd)
The FNAL cooling simulations (Daniel Elvira)
200 MHz cooling experiment (Bob Palmer TBC)
How to get better equilibrium emittance? Consistency with ring cooler?
Results of simulations of emmittance reduction
(Migliorati)
Scenarios for experiments to be made with the facility, requests on beam and detectors (Hanke)
coffee break
Group f : Beams
Design of a 200-300 MeV Muon Beam at PSI for the Muon Cooling Experiment (C. Petitjean)
Possible beam at RAL (R. Edgecock)
Group g : RF X rays
X ray emission: how bad is it ? (Norem TBC)
Questions to working groups and organization (A. Blondel)
17:00 end of plenary session
working group can have first meetings
steering group meeting
Friday 26 October 2001
9:00-12:30 :
parallel group meetings
ROOMS availailable:
simulations: PS large conf room
detectors: PS auditorium
magnets: PS Small 6-2002
RF and X-rays PS Small 6-2008 or CLIC room 18-3030
liquid H2 absorbers: PS Small 37-R019
beams : Bibliotheque PS
14:00 : Resume plenary meeting
Group c : RF system
RF cavities design (200 MHz) (Bob Rimmer)
Economics of RF power vs number of cavities (Working group report)
88 MHz option (Roland Garoby)
results from lab G (Al Moretti)
Group g : X rays
Experimental results (Yagmur Torun or Nick Solomey)
X ray emission: how to reduce it? (Jim Norem)
Group b: Hydrogen absorbers (all or some may shift to saturday morning)
Hydrogen absorber issues (Mary-Anne Cummings)
R&D status of the convection type Liquid H2 absorber at KEK (Shigeru Ishimoto)
Design and cost of LH2 absorbers (Ed Black)
20:00
Workshop dinner
PLEASE REGISTER!
Saturday 27 October 2001
9:00
Group c : Magnets
Magnet issues (Mike Green)
Size and design of the experimental solenoids? (group report)
Group e: Diagnostics
beam particle ID
tracking
particle ID
Running-in scenario for the cooling experiment
14:00
Organizational talks :
How can we finance this thing?
US (Mike Zisman)
Europe (Rob Edgecock, Helmut Haseroth, Alain Blondel)
What is the overall programme of R&D needed before we can actually finalize the design of the experiment? Where is the bottleneck? (Zisman, Geer)
Status of write-up (Alain Blondel)
Discussion and conclusions (Moderated by S. Geer)
17:00 End
Alain Bondel
-
Last modified on
Sat, Oct 20, 2001